-40%

Gator Patch Asphalt Crack Filler Twice for Alligator Cracks - 5 Gallon -24 Pails

$ 1049.66

Availability: 100 in stock

Description

Send Us Your Questions
Get Expert Advice
Home
Pavement Cleaning
Crack Filling Equipment
Sealcoating Equipment
Line Striping
Other
Gator Patch Full Pallet (24 pails)
Features
Industrial-grade asphalt crack filler for wide areas covered with alligatored cracks. Use straight out of the pail with a trowel, squeegee, pallet knife or putty knife!
Covers up to 20 square feet per gallon. Highly recommended for wide areas and up to 150 linear feet of ½" x ½" cracks.
Product dries fast, so your pavement is traffic-ready in 2-4 hours after application! (For best results, ensure that no rain is forecasted within 24 hours and ambient temperature is at least 50°F or 10°C and rising.)
Protects your asphalt pavement against moisture - even in low-lying areas or dips! We recommend sealcoating your pavement 48 hours after Gator Patch has cured for improved asphalt lifespan.
Caution: Do not store Gator Patch under direct sunlight or in temperatures exceeding 100°F (38°C). Close the container tightly when not in use and keep out of children's reach.
If the network of cracks on your driveway or parking lot are widespread but shallow (less than ½”), and appears like a spider's web or the back of an alligator, patch it up with
Gator Patch Asphalt Crack Filler
.
Each pail of this trowelable asphalt patch contains 5 gallons and can cover up to 100 square feet of cracked pavement.
How to Use Gator Patch
Remove the lid and mix the product using a paddle mixer attached to a power drill. Mix gently to avoid making a mess.
Gently spray the cracked asphalt surface with water just until moist. Make sure not to oversaturate. Too much water will thin out the Gator Patch and can inhibit its ability to create a tight seal.
Use a trowel or squeegee to spread the Gator Patch onto the cracks evenly. Make sure that the material actually fills the cracks until flush. This should prevent the walls of the cracks from caving in.
If desired, sprinkle the patched surface with sand to avoid tracking. Allow the patch to cure for at least 4 hours before reopening your pavement to traffic.
Important
Gator Patch is a type of asphalt emulsion and can cause eye and skin irritation if not used appropriately. Always wear protective gear when handling this product. Consult a physician immediately if ingested accidentally.
Item Specifications
Color:    Black
Odor:    Bland asphaltic
Weight per gallon @ 77°F. ASTM D1010, (lbs):                              9.60 ± 0.20
Nonvolatile %, ASTM D2939:                                                          70.00 - 72.00
Viscosity @ 77°F, ASTM D562 (Kreb's Stormer Unit):                    125 min.
Penetration (0.1 mm), ASTM D5:                                                     Pass
Resistance to water, ASTM D2939:                                                 No blistering, no re-
emulsification
Ductility, 77°F 5 cm/min. cm., ASTM D113:                                      Pass
Flammability:                                                                                     Non-flammable
Shelf Life (yrs):                                                                                   1-2
Cure Time:                                                                                          Dries for traffic in 2-4 hours in normal
conditions; Cures completely in 24
hours.
Minimum Application Temperature:                                                    +50°F (DO NOT apply when rain or frost is
forecast within 12 hours)
Application:                                                                                         Cold applied with squeegee
Clean-up:                                                                                            Water and soap. Use solvent for dried
material.
Note
Coverage up to 20 sq. ft. for patching alligatoring areas and up to 150 linear feet of 1/2" x 1/2" depth cracks per gallon. (Coverage will vary, depending on size and frequency of cracks in alligatored areas." A second application of Gator Patch will give cosmetic benefits in terms of smooth, consistent appearance and virtually hiding the outline of the cracks in the alligatored areas.
Policies
SHIPPING
We normally ship within 3 business days of receiving a cleared payment.
DELIVERY
Delivery takes 5-7 business days.
PAYMENT
We accept payment via PayPal or PayPal credit. If you need to pay a different way (e.g., credit card or ACH Bank Transfer) please contact us so we can create a special offer for you.
About Us
We've been helping property owners and pavement contractors to get the supplies and equipment they need to do the job right. Our high-quality, commercial-grade products give your work the edge: long-lasting, professional looking jobs made easy.
We've helped thousands of customers just like you since 2004. Let us help you get exactly what you need. Contact us if you need advice, or any products you don't see listed here.